A cloud migration plan fails in one of two places, and neither of them is the move itself. It fails where an application nobody has dispositioned sits in a wave it was never meant to be in, and it fails where the rollback was written and never tested.

What follows is the actual rule set this agent applies to a migration, and the working days each stage is given. It is not a template. It is what runs every weekday morning against a real plan, and it is published here because nobody selling you a cloud migration template has one.

The stages, and what each one is given

Every program owes these twelve, in this order. The days are working days and they are the starting point the scheduler reasons from, not a quote: a real program moves them, and the point of writing them down is that moving one has to be a decision somebody made.

StageWorking days
Initiateten working days
Discoverfifteen working days
Requirementstwenty working days
Designtwenty working days
Build40 working days
SITfifteen working days
UATfifteen working days
Trainingten working days
Cutover rehearsalfive working days
Go liveone working day
Hypercaretwenty working days
Benefitstwenty working days

A migration adds four stages the baseline does not have, and all four are about proving the move works before it has to.

StageWorking days
Migration designfifteen working days
Data migrationtwenty working days
Dry runfive working days
Rollback planfive working days

The rules this plan is checked against

These are read out of the engine rather than written here, so the table is what actually runs. Seven rules apply to this kind of program on top of the nineteen every program owes, and all of them are checked against every row, every weekday morning.

RuleKindWhat it means
MG-001OrderMigration design cannot start until Discover is done.
MG-002OrderData migration cannot start until Migration design is done.
MG-003OrderDry run cannot start until Data migration is done.
MG-004Lead timeFive working days must pass between Dry run and Cutover rehearsal.
MG-005Lead timeTen working days must pass between Rollback plan and Go live.
MG-010EvidenceDry run cannot close until the evidence is attached: dry run report, reconciliation.
MG-011EvidenceRollback plan cannot close until the evidence is attached: rollback test.

Underneath them sit the nineteen baseline rules every program is held to, whatever it is: design does not complete without sign-off, SIT does not complete without results, go live does not complete without a recorded go/no-go. The documentation has the workbook those rows live in.

RuleKindWhat it means
BR-001OrderDiscover cannot start until Initiate is done.
BR-002OrderRequirements cannot start until Discover is done.
BR-003OrderDesign cannot start until Requirements is done.
BR-004OrderBuild cannot start until Design is done.
BR-005OrderSIT cannot start until Build is done.
BR-006Lead timeThree working days must pass between SIT and UAT.
BR-007Lead timeFive working days must pass between UAT and Training.
BR-008OrderCutover rehearsal cannot start until Training is done.
BR-009Lead timeFive working days must pass between Cutover rehearsal and Go live.
BR-010Lead timeTwo working days must pass between Training and Go live.
BR-011OrderHypercare cannot start until Go live is done.
BR-012Lead timeTwenty working days must pass between Hypercare and Benefits.
BR-020EvidenceDesign cannot close until the evidence is attached: design sign-off.
BR-021EvidenceSIT cannot close until the evidence is attached: test result.
BR-022EvidenceUAT cannot close until the evidence is attached: uat sign-off.
BR-023EvidenceTraining cannot close until the evidence is attached: attendance.
BR-024EvidenceCutover rehearsal cannot close until the evidence is attached: rehearsal report.
BR-025EvidenceGo live cannot close until the evidence is attached: go/no-go decision.
BR-030FreezeNo change goes in inside ten working days of Go live.

Where these plans actually go

  • The undated applicationA row with no date cannot be late, so an application that nobody has decided to retire, rehost or refactor stays quiet while the wave behind it slips. It is the single most common reason a migration date moves, and it is the one a spreadsheet cannot catch on its own.
  • The untested rollbackMG-011 exists because a rollback plan that has never been run is a document rather than a plan. The gate will not close without evidence of a rollback test, and ten working days before go live is the latest it can be run.
  • The dry run that was a demoMG-010 wants a dry run report and a reconciliation, not a successful load. A dry run that moved the data and never counted it against the source has proved that the pipe works, not that the migration is right.
  • Waves sequenced by teamWaves get drawn around who is available rather than around what depends on what, and then the third wave turns out to need something in the fifth. Dependencies held as a graph catch that on the day the wave is drawn.

Build one and look at it

The demo builds cloud migration program in front of you from the rules above, then hands you the real screens on the one it just built. There is something genuinely wrong in it on purpose, and it does not tell you what.

Watch it build one, or pick a different kind of program. No card, nothing to install.